Waiting for the finishing kit I keep busy working on the lighting kit. I discovered a suspicious asymmetry between the right and left fairing's scribe lines (these are the lines carved into the fiberglass showing the location of the rivets and the Molex connector openings). In the picture below I have outlined the scribe lines to make them visible on both extensions showed side by side (right on right).
This does not look right to me.
Answer from the VAF Forum: The fairings are OK. The lights mount one with wires up...one with wires down
No comments:
Post a Comment